OUR WORK

Disrupting the industry, one location at a time.

LULULEMON

CASE STUDY:
Store Roll-out And Installation

CLIENT NEED

Implementing two distinct fully turnkey programs for Lululemon, involving the installation of the MIRROR®
program in existing stores and the deployment of a comprehensive technology package in new stores.

The challenge involved orchestrating the seamless installation process, performing thorough pre-construction
assessments, and efficiently overseeing the management of cutting-edge technology
equipment from various vendors.

DAVACO’S SOLUTIONS

DAVACO executed a comprehensive strategy for Lululemon, conducting pre-construction store site surveys,
installing framed drywall backdrops for the MIRROR® program, and deploying
a new store technology package.

The solution involved configuring and testing technology hardware, fabricating custom data racks,
and coordinating smart hands installation to minimize on-site configuration efforts.

PROJECT INCLUDED

  • Pre-Construction Site Surveys & Matterport 3D Walkthroughs
  • Phase 1,225 Store Installation Roll-Out
  • Fabricate and Install Framed, Drywall Backdrop
  • Pull and Run Power and Data Cabling to Install Location
  • Paint and Finish New Backdrop Wall Installation to Match Existing Site Decor
  • Coordinate On-Site Technology Support Provider
  • Install and Configuration of Lululemon MIRROR® Product
  • New Store Technology Package Deployment
  • Receive and Inventory Technology Hardware from Multiple Vendors
    for Pre-Site Consolidation
  • Configure and Test all Equipment with Store-Specific Configuration
  • Fabricate and Install a Custom 2-Post Data Rack with all Back End Store Equipment;
  • including Configuration, Testing and Labeling
  • Rack and technology components shipped to store and install
  • Pre-Site Prep Minimized Configuration for Equipment On-Site; Smart Hands
  • Installation

CLIENT BENEFITS

  • Seamless MIRROR® Program Activation
  • Efficient New Store Technology Deployment
  • Customized Data Rack Fabrication
  • Minimized On-Site Configuration Efforts
  • Coordinated Program Execution